Subterranean floors within the Pentagon are lettered "B" for Basement and "M" for Mezzanine. The concourse is on the second flooring on the Metro entrance. Above-floor flooring are numbered 1 to 5. Home quantities are given as the floor, concentric ring, and Workplace variety (that is in turn the nearest corridor range followed by the bay number).